Procedures

Procedure is generally suggested regulation where common rules and steps’ sequence of certain company process are defined. Specific process runs according to this regulation.

Each procedure has its header and procedure versions. So called procedure versioning allows to make changes at procedure types which are currently used for processes. New process version is created for the same header in which user can make changes. While for currently running processes at company valid and unchanged version can still be used.

Book Contents

Book Index

Procedure book

Procedure book contains all headers of Workflow versioned processes. Each procedure header can have several procedure versions. However for each header only one procedure version can be valid at a time and which will be used for process.

Procedures book can be displayed on page 1 of Versioned Procedures book by choosing from drop down menu at Procedure field.

pic_1074

Picture: Procedures - book (form after choosing from drop down menu (highlighted in red circle), displaying of list of procedure headers).

In this book new procedure header can be created by using Ins button or existing header for procedure version can be chosen by highlighting the header and pressing Enter.

Book Contents

Book Index

Procedures - basic info (page 1)

On the 1st page of Procedure book basic identification data for procedure header are entered.

pic_1083

Picture: Procedures - page1 Procedure header creation

Description of Fields:

Abbreviation

Abbreviation of procedure header. It is mandatory to enter abbreviation and it is not allowed to have more headers with the same abbreviation.

Name

Name of procedure header

Type

Type of procedure header - user codebook, it's used to e.g. sort or group headers according to certain criteria.

Language Name

This field allows to assign foreign language name to the header (see User’s parameters - Language).

Number

Unique header number automatically assigned by the program.

Book Contents

Book Index

Book Versioned procedures

Versioned procedures book is a list of all procedures' versions for Workflow.

Picture: Versioned Procedures - book

Description of columns:

S

Status of procedure (see icons below).

N

Deployment - provided at least one process of given procedure version exists, then icon will be displayed: - it means that from given procedure version processes are created of which at least one process is not yet finished or it's suspended.

- it means that from this procedure version processes are created, but all of them are finished.

If column is empty it means that no process has been created yet from given procedure version.

Version

Serial number of procedure version automatically assigned by the program.

Release

Release number (not related to version). Number can be edited manually.

Revision

Revision is numbered within release and this number can be edited manually.

Abbreviation

Abbreviation of procedure name.

Valid from

Procedure validity is from given date.

Valid to

Procedure validity is to given date.

When approving versioned procedures, dates infields  "Valid from” and "Valid to” cannot be valid for more headers at the same time. This means that one procedure header can only has one valid (approved) version at a time.

Versioned procedure can have various statuses:

pic_237i

Editor

Newly created procedure or new release or revision. Z Process cannot be created from procedure in this status.

Approved

Procedure ready for process creation. It's not possible to make any changes.

pic_238i

Debugging

Procedure is ready for debugging, i.e. it's possible to create processes and make changes.

Inactive

I don't want to use this procedure version anymore. Z It's not possible to create new process nor change the procedure from inactive procedure.

Keys Description:

Ins

Creation of new procedure version.

F6

New procedure revision (original procedure number will remain in the Release field and Revision field will show one number higher).

Alt+F2

Procedure approval (approved status).

Alt+F3

Procedure deactivation.

Alt+F5

Debugging status set up.

Ctrl+F2

Undo Confirmation of Procedure (from approved status back to editor status).

Ctrl+F6

New procedure release (Release field will show number one higher and Revision field will show number 1).

Shift+F6

Versioned procedure copy.

Note: Procedure, from which the function is initiated, is copied by creating new revision or release. Release or revision number, validity etc. are then adjusted as per our needs.

Book Contents

Book Index

Versioned Procedures - Basic Info (page 1)

On 1. On page 1 of Versioned Procedures we can choose procedure header and find basic information about procedure version, e.g. validity and role which are related to given procedure version.

pic_1061

Picture: Versioned Procedures - page 1 Tab Target

Description of Fields:

Process

Abbreviation of procedure header, language Name of procedure header.

Version

Procedure version number (automatically assigned by the program, numbered from 1 in ascending order for each header).

Status

Actual procedure status (Editor, Approved, Debugging, Inactive).

Valid from

Time from when the procedure is valid. (Procedure must be also confirmed to become valid.)

to

Time to when the procedure is valid.

Release

Release number of versioned procedure. This number can be edited after Guidelines field is checked.

Standard

General codebook of standards to closer identify given guideline (we complete it ourselves according to valid ISO 9000 standards). Field becomes active after Guidelines field is checked.

Classification

Versioned procedure classification (general codebook to closer identify given guideline).

Reviewed

Date and contact person which reviewed given procedure (guideline).

Sensitivity

Choice from user's codebook.

Revision

Revision number of versioned procedure. This number can be edited after Guidelines field is checked.

Chapter

Abbreviation of chapter (general codebook to closer identify given guideline). Field becomes active after Guidelines field is checked.

Guidelines

By checking this field given versioned procedure will be added to guidelines.

Approved by

Date and contact person which approved the procedure version.

Created, Edited, Confirmed by

Date and user which created, edited or confirmed the procedure version.

Procedure document

Document abbreviation which is assigned to procedure.

Display assignment

If checked, Assignment tab is displayed in Process and Work Step.

Description of tabs:

Objective

Description of the procedure version objective. (Task of the process.)

Language description -

it's used for tab localization (see User's parameters - Language).

 

Distribution list

List of contact persons to which the procedure (guideline) version is addressed.

For attention

A list of roles, where the contact persons assigned to these roles can see  the whole versioned procedure in the book Procedures and  steps of the user.

Monitoring

Contact persons included in this tab will have in Monitored Processes book included processes, which are created from this procedure. They will be able to monitor these processes despite they have no right to Browse process. This function is useful e.g. for process monitoring where other users reporting to the user have different tasks.

Right to launch

List of roles where contact persons, included in these roles, can create process from this procedure version.

Responsibility

List of roles where from contact persons, included in these roles, it's possible to choose person responsible for the process when process is being created from given procedure version. These persons can also cancel the process, provided they also have right to Cancel process. These contact persons can also see whole versioned procedure in User Procedures and Steps.

Require

If this option is checked then when creating process it's mandatory to choose responsible person.

 

pic_1063

Picture: Versioned Procedures - page 1 Tab Divider

pic_1064

Picture: Versioned Procedures - page 1 Versioned procedures - page 1 - For attention tab

pic_3028

Picture: Versioned procedures - page 1 - Monitoring tab

pic_4042

Picture: Versioned procedures - page 1 - Right to Launch tab

pic_4043

Picture: Versioned procedures - page 1 - Responsibility tab

Book Contents

Book Index

Versioned Procedures - Editor (page 2)

On page 2 of Versioned procedures book procedure chart is defined.

Chart is created from individual procedure steps (chart junctions) which are connected with arrows. All together they show procedure flow.

More data (in tabs Description, Properties, Variables, Actions, etc...) can be added to chart procedures and objects (arrows and junctions). These define other conditions for procedure flow and refine procedure functionality.

pic_1065

Picture: Versioned Procedures - page 2 Page chapter).

Use left mouse button to highlight step or arrow in the chart. Object will be framed in red colour. Combination Ctrl+Shift+left mouse button should be used to highlight in red more components at the same time. Based on chosen object information related to the object are displayed in tabs below chart.

Book Contents

Book Index

Chart

Chart defines process flow (path).

Junction can be placed in the chart by highlighting desired tool bar icon by left mouse button (icon becomes active) and then we place it by pressing left mouse button to the chart area.

Chart properties:

Connection of two junctions with arrow:

All chart junctions can be moved by pressing left mouse button at junction and dragging it.

Highlighted arrow can be reconnected from one junction to another by dragging it with pressed left mouse button at arrow start or end point.

pic_1073

Picture: Versioned Procedures - page 2 Page chapter).

Buttons Description:

Cut

Chosen objects are cut from charts and inserted to clipboard.

pic_273i

Copy

Chosen objects are copied to clipboard.

pic_275i

Insert

Objects from clipboard are inserted to chart.

pic_276i

Align left

Chosen objects are aligned left (into one column).

pic_277i

Top align

Chosen objects are top aligned (in one row).

100%

Display scale

Change of chart size (in %).

pic_234i

Chart settings

Chart setting options. (For more details please see picture and fields' description below.)

pic_279i

Consistency test

By hitting this icon form with test result appears to show if displayed chart is consistent. Program automatically verifies if procedure starts and ends with correct step type and whether steps are connected.

pic_289i

Object selection

When this icon is highlighted we can select and moveobjects within the chart . We cannot insert them to chart.

pic_280i

Start

Step type Start - mandatory step, identifies start of process run; each versioned procedure has only one of these junctions.

pic_281i

End

Step type End - mandatory step, identifies end of process run; each versioned procedure has only one of these junctions.

pic_282i

pic_283i

pic_284i

Transformation

Decision

Distribution

Process steps, which functions are identical, must be connected with Link arrow.

pic_285i

Nested procedure

Step type Nested procedure - process step which allows to insert (nest)  one versioned procedure to another.

pic_238i

Check point

Checkpoint type step - this is step independent of the process run. It doesn't continue to another junction, has no output. (For example: Process reached some important point which certain person wants to check - characteristic is added to check point.)

pic_286i

For attention

Step type For attention - is used to inform users. Similar like with Check Point, it has no influence on process run. (For example it informs that process has reached to this step or that certain step has been approved in the process.)

pic_287i

Link

Forward Arrow - process continues to another junction.

pic_288i

Back link

Back Arrow - can lead to different (earlier) process junction or to step type End.

pic_301i

Binding shape

Button appears next to Back Link icon if arrow in chart is highlighted. Arrow shape can be selected here:

  • Direct - direct arrow from one step to another
  • Vertical - arrow divided into 3 parts, middle part is vertical and both ends ‘from’ and ‘to’ step are horizontal.
  • Horizontal - arrow is divided into 3 parts. Middle part is horizontal, both ends ‘from’ and ‘to’ step are vertical.
  • Angled - arrow divided into 3 parts, middle part is vertical and both ends ‘from’ and ‘to’ step are horizontal.

Picture: Versioned procedures - page 2 - Chart settings

Description of Fields:

Grid

 

 

Use

If this field is checked chart objects are automatically attached to grid. Grid

 

Display

By checking this field grid is displayed.

 

Horizontal step

Entered number defines pitch between horizontal grid points.

 

Vertical step

Entered number defines pitch between vertical grid points.

Visible descriptions

When checked Names of chart steps are displayed.

Framing of descriptions

If checked Names of charts are displayed in frames.

Framing of junctions

If checked chart junctions are in frames.

Font

When this button is pressed form to choose font type to describe chart objects is displayed.

Disable desktop components shift

If this field is checked it’s not allowed to shift chart objects.

Order of steps button

By pressing this button form where individual steps are sorted is displayed. User can then sort steps in chronological order. This can be done with buttons or via function "Drag and drop”. User can also enter steps to different levels based on how he/she wants to number the steps in reports.

pic_2686

Picture: Order of steps form

Based on how user sorts the steps here they’ll then be displayed in Procedure report or in Guidelines.

Book Contents

Book Index

Description

Description of procedure or step can be entered under tab Description.

Descriptions are accessible either in Book of steps (for each step) or in Book of processes. Descriptions are also displayed in procedure reports.

Descriptions can be locally assigned by Language description button (see User parameters - Language).

pic_2448

Picture: Versioned procedures - page 2 - Description tab

Book Contents

Book Index

Properties - VERSIONED PROCEDURES

In this tab we enter or display properties of procedure, step or arrow. If we want to enter procedure properties we have to click anywhere to chart area, apart from step and arrow. If we want to enter step or arrow properties desired object must be highlighted in the chart.

Procedure properties

pic_2447

Picture: Procedure properties tab (without step highlighting)

Description of Fields:

Priority

Each step has its Priority which determines priority of specific procedure. In specific procedure we can then change the priority. Procedure priority is also entered as default value for steps, see below.

Calendar

Field, which is entered as default value for steps, see below.

Interval type

Field, which is entered as default value for steps, see below.

Maximum time for process

Field which shows maximum time of the process run. It's calculated from step values in field Time to complete step and its calculation is based on ‘Longest path through chart’ system (logic). System ignores back arrows and steps forwarding among users during calculation. If user changes time values for steps field is recalculated after procedure is saved or button Recalculate pressed.

Recalculate

When this button is pressed so called ‘Longest path through chart’ is recalculated. Value in field Maximum time for process is recalculated according to current values entered in field Time to complete step in individual steps. In procedure chart this ‘Longest path’ is displayed by highlighting junctions and arrows with green colour.

Time to complete step

Field, which is entered as default value for steps, see below.

Fields Priority, Calendar, Interval type and Time to complete step are entered as default values for steps here. Each newly created step will then have these values filled in the fields under tab Properties. If values in these fields will be changed and procedure will have some steps already created, system will ask if changed value should also be updated in already created steps. If "Yes” is entered value is changed in all steps and will be valid also for all newly created steps. If "No” is entered new value will only be valid for newly created steps.

Step properties

pic_1067

Picture: Properties tab after step is highlighted

Description of Fields:

Abbreviation

Step abbreviation. It’s pre-defined, can be changed, must be unique within suggested procedure.

Name

Name of step. This name will also be displayed in chart at step.

Language Name

It allows to enter Name of step in other languages (see User parameters - Language).

Documentation text

Text you want to show at step when printing reports Procedure and Guidelines.

Grouping

It allows user to include the step in group of steps (see below Grouping of steps).

Priority

Step priority is entered. Field is pre-filled according to Priority defined in procedure. User can sort steps according to defined priority in book Work steps/For processing (priority is displayed on page zero in Pt column with flag symbols of various colours - see Work Steps - Book).

Calendar

Calendar is entered here - according to this calendar, which defines work shift of users, deadline till when user should process with step will be calculated. Field is pre-filled according to Calendar defined in procedure. Calendar set up see below "Deadline set up”

Interval type

Interval type, which specifies value in Calendar field, is entered here. Field is pre-filled according to Interval type defined in procedure. Same interval type must be entered like in field Calendar in used calendar item.

Time to complete

Deadline till when user should complete step (approve, forward, reject) is calculated according to Time to complete step. Deadline is displayed in Process step in field Deadline. Field is pre-filled according to Interval type defined in procedure. Deadline to complete step takes into account also values entered in fields Calendar and Interval type.

Send notifications for new step

By checking this option notifications will be sent to users when new process step will be created.

Send notifications related to step completion deadline

By checking this option notifications will be sent to users when new process step will be created.

Deadline set up

For correct calculation of deadline to complete the step by users it’s necessary to correctly set up Calendar and Interval type. In these fields we define work time for users (employees), i.e. working hours during which they are at work. Time to complete step is then calculated only in these hours. Calendar must have specific work time set up for users, see picture.

pic_2778.png

Picture: Payroll calendar, calendar set up

In the picture we can see that calendar "HOD 7,5” has working time set up to 8.00a.m.-4:00p.m. In case we use this calendar in step then step assignees, whose time to complete is being counted down, should have this working time. Time to complete is counted down till 4.00 p.m. first day and continues from 8.00a.m. the next day. These working hours are entered e.g. on page 2 of Payroll calendar book. Same Interval type which was used in procedure step must be entered also in this item.

Arrow properties

When setting arrow properties we decide what status should process change to when passing through arrow (No change, Suspended, ...).

When creating arrow there is behaviour set up under tab Properties and there is No change entered in field Change Process Status to.

pic_1069

Picture: Arrow properties form open in Properties tab window after arrow is highlighted

Arrow can have following properties defined:

Name

Arrow name - text shown in chart next to arrow.

Order

It determines in what order were arrows leading from one junction created and in what order they’ll be served.

Change process status  to

Here we can influence process status. This can be used for decision making about nested procedure steps or to display process status. Here we can see current process status or get info if process ended with approval or rejection. If process gets through the arrow process status is changed to:

  • "Running” - process status will change to "Running”.
  • "Do not change process status” - process status remains unchanged (default).
  • "Approved”- process status will change to "Approved”.
  • "Suspended” - process status will change to "Suspended”.
  • "Rejected” - process status will change to "Rejected”.

Arrow property is also its shape, see iconpic_301i Icon description - Chart.

Grouping of steps

Grouping of steps allows user to link more procedure steps in one group. Following step then considers the grouping to be one unit (step). Step grouping is used if people in a step with  the same (or similar) task cannot see each other's values for their variables. Therefore they cannot be added to role at one step. Step must be approved by each of them separately and the next step can only be created when all steps in group are approved.

pic_1139

Picture: Versioned Procedures - Editor- page 2- Grouping of steps

Creation of Steps grouping

Step can be included in grouping after it’s marked in Properties tab. This can be done by entering one digit number or letter in field Grouping - so called Marking of grouping. This marking must be equal for all steps which we want to include in one grouping. In chart marking of grouping is visible next to step name. It's letter or number of grouping shown in brackets.

Back link arrow must lead from each step in group. Step is cancelled for all persons at steps in grouping when step is rejected by one user and new step is created to which leads Back link arrow.

Example of use:

Persons assigned to steps "Production Cost Centre”, "Sales Cost Centre” and "Purchasing Cost Centre” (further as "Cost Centre Managers”) should approve revenue which have been sent to each "Cost Centre Manager” by person assigned to step „Enter revenue and submit for Approval Step with name "Revenue approved” cannot be created until all "Cost Centre Managers” approve their steps. Steps "Production Cost Centre”, "Sales Cost Centre” and "Purchasing Cost Centre” have then been included in Grouping "A”. If all steps in this grouping will be approved, step with name “Revenue approved” will be created. If any person from grouping "A” rejects the step, process will be returned back to step „Enter revenue and submit for Approval When step „Enter revenue and submit for approval“ is processed again, new steps will also be created for all persons in grouping.

Note: If person at step "Production Cost Centre” rejected the step before persons at steps “Sales Cost Centre” and “Purchasing Cost Centre” approved their steps, then these steps will be cancelled for them. If however they already managed to approve their steps, they’ll not be cancelled by rejection of another user in the grouping of steps.

Book Contents

Book Index

Assignees

In Assignees tab we enter roles which should process given step. It’s also defined here how the step assignee should be chosen (field Selection method). Set of all contact persons assigned to roles is displayed to user to choose assignees of specific step. From this set of assignees user then chooses step assignee for specific process.

pic_2449

Picture: Versioned Procedures - Editor - page 2 - Assignees

Description of Fields:

Selection method

Selected method defines how and for whom the step will be created. Default entry is All.

 

One of them

Step is created for all owners in the Role acceptance of a step by one of these solvers is canceled by the remaining given step. (If one of the assignees proceeds with different event than Reading, step is cancelled for all the others.)

 

One of selected by user from

Contact persons list is displayed to user which is about to complete the step and before new step is created from which the user can:

  • choose owner of the next step for which only is the new step created,
  • mark with star more owners of next step, which is then created for all marked owners. When step is approved by one of them, it’s deleted for all the others.

 

 

All

Step is created for all owners in the Role. All the persons must approve the step. Event Approval is actioned when the last person in role approves the step. In case of Rejection it's enough when one assignee rejects, step is then cancelled for all the others.

 

All selected by user

Option to choose contact persons is displayed to user which is just about to complete the step and before new step is created. Step is then created only for selected persons. Further it's then proceeded according to selection All.

Take cost centre into account

There is condition to link workflow to organisational structure. If a structure according to job positions is defined in the organizational structure, the tree from this structure will be respected and the corresponding step will be displayed to the solvers from the given branch.

Superior

There is condition to link workflow to organisational structure. If a structure according to job positions is defined in the organizational structure, the tree from this structure will be respected and the corresponding step will be displayed to the solvers from the given branch.

Roles

Step assignee from Role book is chosen here. Persons included in these roles can be chosen to solve this step.

Role deputy - Regime

Regime of role deputy based on which other persons can deputize persons included in roles and shown in Role field. Deputizing description - see Deputizing.

Book Contents

Book Index

Deputizing

Deputizing is used when assignee is absent (i.e. has active Absence) and the step needs to be solved by another person.

Role deputy regime is set up fro individual Roles in form Step Assignee:

When deputizing in regimes "Manager” and "According to role” option Take cost centre into account can be activated - in this case only persons, which have the same cost center in organizational structure as assignee does, can deputize.

pic_4116

Picture: Deputizing "According to role” set up

All deputies have specific steps displayed in books Steps and For processing. In these books deputies can change assignee by starting operation Deputize (assign the step to themselves) ans start working on the step.

Step resolution can also be transferred to deputy by operation Forward. Option to transfer steps in specific process have following persons:

It’s possible to transfer steps not only to deputies, but also to other step assignees (or back to the original ones).

Book Contents

Book Index

Variables

Variables allow users to add more values when working with process. This is how the data structure of the process can be broadened (e.g. thanks to the variable we can force users to enter cost center which should approve the invoice or enter start and end date of vacation period, ...) .

With variables we work especially when using parameters in tab Action. Variables which are entered here are created in book Definition of Variables and from this book are then being chosen.

If we want to set up further properties for variable, which will be related only to this procedure, it can be done under tab Variables. Tab will be displayed if no step in chart is highlighted. So we enter variables for the whole process and we use these variables in the steps. Variables can be entered here by pressing Ins key.

pic_1075

Picture: Form Procedure variable - Versioned procedures -  Page 2 - tab Variables

Description of Fields:

Variable

Variable from Definition of Variables book is chosen to this field.

Start value

Here we can enter Value which will be automatically saved to Variable when new process is formed. User can rewrite the value in the process.

Internal variable

If Procedure variable is marked as Internal, it will not be displayed in book Steps after pressing Shift+F8. Variable not marked as Internal will be displayed with its current value after pressing these buttons.

Passed entry variable

If there When this field is checked and if the same Variable exists insubordinate (subprocess) or superior process, values of this variable will be passed on.

Example: There’s a process with step “A“ and variable value “5“. In following subprocess there’s step “B“ with the same variable and with checked field Passed entry variable. To the value of this variable value “5“ from step “A“ is entered.

Passed exit variable

When this field is checked values of the same Variable will also be passed back when exiting from subordinate to superior process or vice versa.

Example: Step “A“ and variable value “5“ exist in subprocess. In following subprocess there’s step “B“ with the same variable and with checked field Passed entry variable.  in step “A“ this variable will also be rewritten to value “6“.

Source variable

This field is displayed only when Variables are chosen and option Calculated is ticked. This variable is chosen from Definition of Variables book. Value of source variable is considered in calculated variable (see below).

Calculated variables

If variable with ticked option Calculated (on page 1 of Definition of Variables book) is your chosen variable then it can be picked by source variable. Source variable replaces calculated variable. Doing so we can achieve that different values can be monitored at the same variable.

Example: We have procedures “A“ and “B“. To make decision in procedure “A“ we are interested in cost centre (variable STR); in procedure “B“ we want to monitor variable DNU_PL:

pic_1076

Picture: Form Procedure variable - Versioned procedures - page 2 - tab Variables

Book Contents

Book Index

Actions

Actions arise in process when steps are worked on by users. Whole process run is driven by these actions.

User or system actions exist.

By entering parameters or scripts for the actions we can manage and control the process better as well as determine which direction the process will go (by entering or calculating values of its variables), find out current status of the process or whether process or its individual steps meet time schedule.

Parameters and scripts, entered in actions, are later at certain actions during process run initiated.

At processes Status change of process is recorded via actions, at steps History of step actions is recorded (in Process book).

New event is entered with Ins button under Action tab.

pic_1135

Picture: Form Versioned procedures - basic info - Page 2 - tab Action

Description of Fields:

Action

Here events are set up at which Scripts should be initiated or Parameters operated. Procedure has Entry as default event set up and this cannot be changed. Arrow has event Entry set up and it cannot be changed. Steps have several events pre-set, see description below.

Script

Here we can choose Script which will be initiated at action entered in field Event. Script description - see Scripts. Parameters which will be used and evaluated by the script can be entered in field Parameters.

Editor

If Script is chosen text editor with script content is displayed after clicking on this field .

Parameters

It is used to enter Parameters which will be operated at given event. Description of parameters - see Parameters. If we entered script and to the same event we also want to add parameters, which however don’t belong to the script, these parameters must be added in the next step (procedure) item.

Up

When more parameters are entered, highlighted parameter might be shifted up in the list.

Down

When more parameters are entered highlighted parameter might be shifted down in the list.

By checking this field frame on the side becomes active and with programming language it’s possible to add or change functionality of existing parameters here.

Procedure action

If no object is highlighted in chart, Procedure (process) actions are being created. Only Entry action can be entered as procedure action. It’s initiated when newly created process is saved for the first time.

pic_574

Picture: Form Action in procedure with open menu for field Value at parameter ProcStatus

Object action

If object in chart is highlighted, Action for this object (step or arrow) is created.

pic_1011

Picture: Form Action in procedure step with open menu for field Event.

Description of step actions:

Form

Script or parameter is initiated when action Form is entered and step detail in book Steps is initiated (display of form Work step).

Approval

Script or parameter is initiated when action Approval is entered and step approved by the user (if addressed to more users for approval then all of them must approve).

Forwarding

Script or parameter is initiated when action Forwarding is entered and step forwarded to deputy by user. It’s initiated also at Deputizing by user.

Reading

Script or parameter is initiated when action Reading is entered and step is read by user. This event happens if user opens step detail (in book Work Steps).

Acceptance

Script or parameter is initiated when event Acceptance is entered and step is accepted by user. By accepting user agrees to solve given step. If step should be solved by only one from given Role (see book Versioned procedures, tab Properties), step is cancelled for the others.

Monitoring

It is used to evaluate process, it initiates evaluating scripts. When this action is entered field allowing you to enter Type is displayed. Type is user codebook and here we can e.g. enter what should be monitored in evaluation.

Entry

Script or parameter is initiated when action Entry is entered.

Exit

Script or parameter is initiated when action Exit is entered and step is finished (approved or rejected).

Rejection

Script or parameter is initiated when action Rejection is entered and step is rejected by user. If step is addressed to more users, scripts and parameters are initiated already when one of the users rejects.

Scripts and parameters:

By entering parameters or scripts to At action we define that some other activities are to be executed during this action. This is how we can further manage process run, e.g.:

More detailed scripts and parameters description, see Skripts workflow and Parameters workflow.

Book Contents

Book Index

Versioned Procedures - Reports

Book Contents

Book Index

Process

Process No.: WKF003; WKF004; WKF005

Report ID: SWKF002

File: WProcedure.AM

Report description: The Procedure report displays the Workflow Versioned Procedure, its Basic data, Target, Description and Chart It also shows the individual Process Steps with the description, users Role and Evaluation.

Address in the tree: [Work Office] [WorkFlow] [Workflow Administration] [Procedure]

Reports parameters:

DistributionList- No

Yes - print according to the Distribution List. The text at the end of the report will contain the names of the people to whom the document is addressed (the contact persons stated in the Distribution List folder on the first page of the Versioned Procedures book). If there more persons are specified in the distribution list, the report will be created for each person.

LogoPictureFooter - Footer.wmf

The file name for displaying the footer. The path to where the file that is to be displayed as a logo is saved is written here.

LogoPictureHeader - Header.wmf

The file name for displaying the header.

LogoPictureSmall- Logo.bmp

The file name for displaying the logo.

ShowEvaluation- Yes

Yes - the evaluation is displayed.

ShowGraph- Yes

Yes - the procedure chart is displayed.

ShowChapterAbrr - No

Yes - the chapter abbreviation is displayed; No - the chapter description is displayed

ShowLongDescr - Yes

Yes - the Long Description of a metric is displayed.

ShowMetricDescr - Yes

Yes - the Description of a metric is displayed.

ShowNormAbbr - No

No - the description of a norm displayed; Yes - the abbreviation of a norm is displayed

SupplementQuantity - 0

Number of attachments

WPOSTUP

WPOSTUP_1

Book Contents

Book Index

Process Scheme

Process No.: WKF003; WKF004; WKF005

Report ID: SWKF003

File: WProcessChart.AM

Report description: The Process Scheme report shows the Procedure Chart with names of the individual Procedure steps.

Address in the tree:

Reports parameters:

LogoPictureFooter - Footer.wmf

The file name for displaying the footer.

LogoPictureHeader - Header.wmf

The file name for displaying the header.

LogoPictureSmall- Logo.bmp

Logo.

Sensitive -

The level of sensitivity (the text which will be displayed in the header).

WPROCESSCHART

Book Contents

Book Index

List of metrics

Process No.: WKF003

Report ID: SWKF005

File: WMetrikList.AM

Report description: The list of currently measured metrics of the QMS system. Shows the list of all variables that are marked in the Definition of Variables book as a Metric, and which are used in the confirmed procedures.

Address in the tree:

Reports parameters:

GroupByProcess_DSC1 - Yes

Yes - group by procedure; No - the metrics are listed alphabetically according to the Marking.

LogoPictureHeader - Header.wmf

The file name for displaying the header.

LogoPictureFSmall- Logo.bmp

The file name for displaying the logo.

Sensitive -

The level of sensitivity (the text which will be displayed in the header).

WMETRIKLIST